Completed projects include:
- Ambassador Way - reconstructed and improved the street surfaces and drainage making it a fully functional
four lane street, two lanes in each direction.
- Post Oak Lane / Skylark - New road dubbed the “missing link,” runs north and south connecting San
Felipe to Ambassador Way. This new street allows commuters to get from the Galleria / Westheimer to
Woodway without ever driving on Westheimer, Post Oak Boulevard or San Felipe.
- West Alabama - Reconstructed the roadway between Post Oak Boulevard and the Southbound IH 610-West Loop southbound
frontage road to serve as one of the entrances to the West Loop.
- McCue - Reconstructed 40 feet of pavement from Westheimer to Chevy Chase.
- Post Oak Boulevard - Widened the intersection at Richmond to better align Post Oak Boulevard for the entrance to the new Westpark Tollway.
- Sage - Widened from a four-lane divided roadway to a six-lane divided roadway between Hidalgo and West Alabama;
installed a 48-inch storm sewer line to provide additional safeguard against local flooding.
- Sage and Rice - Reconstructed and improved the intersections of Sage Road and Rice at US 59 to create better access to the new Westpark Tollway.
- San Felipe from Yorktown to Sage Road - Reconstructed the pavement, installed a major water distribution line and replaced water and sewer lines.
- Uptown Park Boulevard - Widened the intersection at Post Oak Boulevard to four lanes; added a right-turn lane from Post Oak Boulevard to northbound Uptown Park Boulevard.
- Post Oak Boulevard – City of Houston Sewer Line Repair Project 2007 between Westheimer and Richmond.
Date last reviewed: 8-31-09.